Project documents

PROJECT DOCUMENTS
COMMUNICATION DOCUMENTS
Deliverables

D.1.1 Project manual and Quality Plan

D.1.2 Risk mitigation plan

D.2.1 Report about user and data requirements

D.2.2 Analysis of available and suitable sensors

D.2.3 Data management Plan

D.2.4 Technical requirements of the WA Tool

D.2.5 Field Test Strategy

D.2.6 Intervention protocol

D.3.1 Health surveillance assessment parameters & metric definition Report

D.3.2 The model for cognitive and emotional assessment in WA

D.3.3 Model for behavioural interaction within WA

D.3.4 Intervention measures report and interaction with the system

D.4.1 Visualization platform sub-system

D.4.2 Gestural analysis sub-system

D.4.3 Voice-based sub-system

D.4.4 Eye-tracking sub-system

D.4.5 Facial affect analysis sub-system

D.4.6 Neurometrics

D.4.7 WA Tool with services integration

D.4.8 Location function & E112 sub-system

D.5.1 IOT system REPORT

D.5.2 Data Collection from real-world resources: IoT connected devices

D.6.1 Ontology

D.6.2 Agent backend model

D.6.3 Learning and reasoning engine

D.7.1 Ethical and Legal report.

D.7.2 Security and Privacy Model

D.8.1 OSMOSH Supervision System

D.8.2 Functional WA system

D.9.1 Pilot Operational Manual

D.9.2 Final Assessment report

D.10.1 Dissemination/Communication Plan

D10.2 Branding box of all Dissemination material.

D.10.3 Report with lessons learnt from other projects.

D.10.4 Standardization report

D.10.5 Exploitation strategy and value chain modelling

D.10.6 Business model and business strategy

D.10.7 IPR plan

Scientific papers

According with the project, scientific results (data from research and related publications) in an open access format, are expected to be produced towards the project lifetime with the aim of share new knowledge and get feedback from the scientific community.

Leaflet + Brochure + Poster + Fact Sheet

Brochure: a brochure with detailed information about project objectives and achieved results will be edited once the project’s pilots have concluded.

Fact Sheet: 3 Fact sheet will be created during the project at the end of each research cycles. It will contain information about the project’s process and at the end of the analysis cycles with results of the project

Press kit+ Guidelines

Press kit: Logo+ slogan.
Guidelines: The Press releases will provide details of the project goals and status and will be made specially to mark the delivery of key results or key events organized in the framework of WorkingAge. The Press releases will have a catchy title, a 4-5-line introductory paragraph summarizing the key message and will be accompanied with a ‘note to the editors’, in order to include contact details of the relevant persons and key references (web links, publications, etc.) at the end of the press release. It will offer the possibility to meet members of the consortium for an interview, make a visit to the partner’s laboratories, etc.

Twitter
LinkedIn